-
Roof Inspection & Estimate: Our specialists perform a detailed inspection, evaluate your building’s structure, and provide a written estimate including labor, materials, and timelines.
-
Preparation & Tear-Off: We remove existing materials, inspect the roof deck, and repair or replace any damaged sections before installation.
-
Underlayment & Flashing Installation: A high-quality waterproof underlayment is installed to prevent leaks. Flashing is applied around vents, HVAC units, and other penetrations.
-
Roofing System Installation: We install your chosen roofing material—TPO, EPDM, metal, or tile—following strict manufacturer specifications for optimal performance.
-
Ventilation & Drainage Setup: Proper ventilation and drainage systems are added to prevent moisture buildup and heat retention.
-
Final Inspection & Site Cleanup: After completion, our crew performs a full cleanup and final inspection to ensure top-quality workmanship and safety compliance.